How to work out diversity,
step by step.

Not everything in a building runs flat out at the same time. Diversity is the allowance for that — and it decides whether the supply, main fuse and board can cope. Here's how it's worked out under BS 7671:2018+A4:2026 (previous A2:2022+A3:2024 version also current until 15 October 2026), with an example you can follow on paper.

What BS 7671 says

Chapter 31, Reg 311.1: maximum demand must be determined for economic and reliable design within thermal and voltage-drop limits, and diversity may be taken into account. The regulations don't set the percentages.

Where the numbers come from

The usual allowances are guidance in the IET On-Site Guide, Appendix A (typical diversity). They suit ordinary households and small premises; other buildings need a figure based on how they're actually used.

Amendment 4 context

The Reg 311.1 principle is unchanged. Alongside it, energy management and load curtailment are now recognised ways to actively limit demand — for example for EV charging — rather than assuming loads won't coincide.

The method

Five steps.

  1. 1

    List every circuit and fixed load

    Work from the board schedule and the rating plates. Convert watts to amps: I = P ÷ 230.

  2. 2

    Group the loads by type

    Lighting, sockets, cooking, showers, water heating, EV, heating — each group has its own allowance.

  3. 3

    Apply the allowance to each group

    Use the factors below (or a justified figure for the actual use of the building).

  4. 4

    Add the groups together

    This is the assessed maximum demand.

  5. 5

    Compare with the supply and switchgear

    Check against the service fuse, main switch, meter tails and any submain. If it's close or over, revisit the loads or add load management.

Typical allowances — households

The diversity factors.

Type of loadAllowance
Lighting66% of the total demand
Socket-outlet circuits100% of the largest circuit + 40% of every other circuit
Fixed space/panel heatingOur calculator counts 100% pending current-table verification; secondary guidance reports first 10 A + 50% of the excess, with exclusions.
Cooking appliancesFirst 10 A + 30% of the remainder, + 5 A if the cooker unit has a socket
Instantaneous water heaters (showers)100% of the largest + 100% of the second largest + 25% of the rest
Thermostatic water heaters (immersion)100% — no diversity
Floor warming and thermal storage heating100% — no diversity
EV charging points100% — no diversity (use load management instead)

On-Site Guide Appendix A: Table A1 covers assumed current demands and Table A2 covers diversity allowances. The reference calculator states it checked the A2:2022 edition, not the current A4 table. Heating is not the socket-circuit largest-plus-40% rule; our tool now conservatively uses 100% pending verification of the current row and exclusions. These are guidance, not BS 7671:2018+A4:2026 (previous A2:2022+A3:2024 version also current until 15 October 2026) requirements.

Worked example

A three-bed house on a 100 A fuse.

LoadWorkingDemand
Lighting: 1,200 W total → 5.2 A5.2 × 66%3.4 A
Sockets: 32 A ring + 20 A kitchen radial32 + (20 × 40%)40.0 A
Cooker: oven + hob 7 kW → 30.4 A, unit with socket10 + (20.4 × 30%) + 521.1 A
Electric shower: 8.5 kW → 37.0 Alargest at 100%37.0 A
Assessed maximum demand101.5 A

Connected load without diversity: 5.2 + 52 + 30.4 + 37.0 ≈ 125 A (sockets counted at their device ratings). Diversity brings it to about 101.5 A — just over a 100 A fuse, which shows how cautious the method is. In practice you'd review the real loads before concluding the supply is inadequate.

Now add a 7.4 kW EV charger (32 A at 100%): 101.5 + 32 = 133.5 A. That clearly exceeds the supply, so the charger needs load management / curtailment that reduces its output when the house is busy — or a supply upgrade agreed with the network operator.

Diversity, maximum demand, load curtailment

  • Connected load — everything added up at full rating.
  • Diversity — an assumption that loads won't all run together.
  • Maximum demand — the result after diversity, compared with the supply.
  • Load curtailment — a device that actually limits demand, so it can be relied on where assumptions can't (e.g. EV charging).

Use with care

Diversity is engineering judgement, not a pass/fail rule. Long-duration loads (EV, immersion, storage heating, heat pumps) get none. Commercial and HMO properties need factors based on actual use. Figures here are worked illustrations — check the current On-Site Guide and BS 7671:2018+A4:2026 (previous A2:2022+A3:2024 version also current until 15 October 2026) for real design.

Sources and limits

TradeCalculator — domestic allowances and edition statement is secondary evidence, not a substitute for the current On-Site Guide.

IET — Electrical Diversity and Load Curtailment webinar Q&A (2020) states no diversity for a heat-pump circuit or its overall-demand contribution; load curtailment may be used instead. Use equipment data for circuit design.

Questions

Does BS 7671 give diversity factors?

No. BS 7671 Reg 311.1 requires maximum demand to be determined and allows diversity to be taken into account, but it does not set the percentages. The commonly used allowances are guidance in the IET On-Site Guide, Appendix A.

Did Amendment 4 change how diversity is worked out?

The basic requirement in Chapter 31 is unchanged: assess maximum demand, and you may allow for diversity. What has grown in recent amendments is recognition of energy management and load curtailment (for example for EV charging and prosumer installations), which actively limits demand rather than assuming it.

Can I apply diversity to an EV charger?

Treat an EV charging point as running at full load for long periods — no diversity is normally allowed (Section 722). If the assessed demand is too high, the answer is a load-management or curtailment device, not a diversity factor.

Is diversity used to size the cable of a single circuit?

Generally no for final circuits feeding one fixed load: the cable is sized for the design current of that load. Diversity is mainly applied to the total demand on the supply, distribution boards and submains, and to the cooker circuit allowance.

What if my answer is higher than the main fuse?

The On-Site Guide method is deliberately cautious. Review the actual loads, consider load management, and if needed ask the network operator about the supply capacity — never just fit a bigger fuse or main switch.