Skip to main content
EMERGENCY HELP!

For electricians

Method statement generator

A site-specific electrical method statement (SWMS) you can build on the van and export as a printable PDF. Pre-loaded with the sequence Paul follows on a typical domestic job — arrival, dynamic assessment, safe isolation to GS38, the works, Part 6 testing, re-energisation and housekeeping. Aligned with HSE guidance, EAWR 1989, CDM 2015 (where applicable) and BS 7671:2018+A4:2026 (previous A2:2022+A3:2024 version also current until 15 October 2026).

Pair with the risk assessment generator for a complete RAMS pack. Nothing you type is uploaded — the PDF is built in your browser.

Project details

Sequence of work

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

Step 7

Step 8

Ready to download?

Generates a printable A4 PDF with project details, sequence of work, references and a briefing sign-off block.

Notes

A method statement describes how a task will be done safely; the risk assessment identifies what could go wrong and the controls required. Brief every operative before work starts and re-brief on any change of scope or conditions.

This tool assists competent judgement — it does not replace it. Adapt every entry to the job in front of you.